London Data Centre LD6 Phases 2 and 3


Client Name:

Mercury Engineering Building Services Ltd

Start Date:

April 2016

End Date:

On Going

Job Description:

  • London Data Centre 6 is the most recent of London Data Centres that ICS Ltd have been involved with having completed Phase 2 in 2016 we are due to complete Phase 3 in the Autumn of 2018.
  • ICS will have Installed and connected UPS Switch Rooms 3 through to 8 over Phase 2 and 3 as well as Sub-Mains cables, Chiller Cables, Generator cables , UPS cables as installing connecting and testing of MV cables.